Cabinets Being Installed in Building 700 |
![]() |
Buildings 800, Left and 700 Far right |
As always, pictures speak 1000 words, and so I have included pictures of our progress. As of March 31 the suites in Building 700 are being trimmed out as it nears completion. That means the suites are being painted, cabinets and light fixtures are being installed. Flooring, carpeting, and all the other things that transforms a space into a home are being installed.
Meanwhile, building 800, which has 24 units, proceeds along right behind building 700. It is interesting to watch the construction progress. It resembles a wave as construction moves along from one building to another. The above picture illustrates this nicely as the construction progress moves from building 700 on the far right to building 800 on the left.
As always, pictures speak 1000 words, and so I have included pictures of our progress. As of March 31 the suites in Building 700 are being trimmed out as it nears completion. That means the suites are being painted, cabinets and light fixtures are being installed. Flooring, carpeting, and all the other things that transforms a space into a home are being installed.
![]() |
Preparing for Building 900 |
![]() |
Site Work for Buildings 1100 and 1200 |
Watch future posts for updates to the construction and other exciting things that makes Claysville Landing the place to live. How about a real, honest to goodness dog park?!! Yes, a place your dog can play off the leash in a secure area designed just for dogs. Even better, it is the only one in the Elizabethtown area, and it's only at Claysville Landing.
A project like this involves a lot of people working as a team to make it a reality. I will highlight some of those people in future posts. Like a jigsaw puzzle, there are a lot of pieces that have to fit together in a certain way, and without the knowledge and skills of our team members, we would still be looking at an empty field instead of a place people can call home.